Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,033
matching recommendationsNAICS | 3334 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0049 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,840 | $0 | n/a |
NT0049 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,101 | $17,176 | n/a |
NT0049 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $79,073 | $292,302 | n/a |
NT0049 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,061 | $5,609 | n/a |
OK1148 # 03 Y:2025 | 03 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,106 | $5,620 | n/a |
NT0049 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $7,764 | $7,308 | n/a |
OK1148 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,237 | $115 | n/a |
OK1148 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,079 | $5,115 | n/a |
OK1147 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $687 | $0 | n/a |
OK1147 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,012 | $0 | n/a |
OK1147 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,474 | $13,679 | n/a |
OK1147 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $15,914 | $8,034 | n/a |
OK1147 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,835 | $21,094 | n/a |
OK1147 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,712 | $1,080 | n/a |
OK1147 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,308 | $0 | n/a |
OK1147 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,489 | $1,176 | n/a |
WM0243 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,986 | $6,560 | n/a |
WM0243 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,814 | $7,679 | n/a |
WM0243 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $103,411 | $360,000 | n/a |
WM0243 # 02 Y:2025 | 02 | 2025 | ISOLATE HOT OR COLD EQUIPMENT | $65,812 | $40,930 | n/a |
WM0243 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,013 | $3,550 | n/a |
MS0444 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,814 | $400 | n/a |
MS0444 # 04 Y:2025 | 04 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $52,643 | $67,500 | n/a |
MS0444 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,624 | $2,466 | n/a |
MS0444 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,224 | $613,200 | n/a |