IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

992

matching recommendations
Reset
NAICS 3334 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1087 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $487 Not Implemented
UD1087 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,614 $6,258 Not Implemented
UD1087 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $399 $1,254 Not Implemented
UD1087 # 07 Y:2024 07 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $303 $900 Not Implemented
UD1087 # 08 Y:2024 08 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $601 $2,093 Implemented
OK1115 # 06 Y:2024 06 2024 OPTIMIZE PLANT POWER FACTOR $1,165 $3,332 Not Implemented
OK1115 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $947 $6,554 Not Implemented
OK1115 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,916 $166,007 Not Implemented
OK1115 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $2,944 Not Implemented
OK1115 # 04 Y:2024 04 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $7,273 $11,595 Not Implemented
OK1115 # 05 Y:2024 05 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,659 $47,850 Not Implemented
IC0306 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $41,459 $20,803 Not Implemented
IC0306 # 07 Y:2024 07 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,874 $10,418 Not Implemented
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 Implemented
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 Implemented
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 Implemented
IC0306 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,629 $118 Not Implemented
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 Not Implemented
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 Not Implemented
MI0442 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,002 $70 Implemented
MI0442 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,918 $917 Not Implemented
MI0442 # 04 Y:2024 04 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,720 $159,280 Not Implemented
MI0442 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,876 $16,028 Not Implemented
MI0442 # 02 Y:2024 02 2024 METER WASTE WATER $13,483 $956 Implemented
MI0442 # 01 Y:2024 01 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $16,134 $240 Implemented