Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 333413 | Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1009 # 07 Y:2019 | 07 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $8,182 | $1,430 | Implemented |
OK1009 # 06 Y:2019 | 06 | 2019 | PAY UTILITY BILLS ON TIME | $371 | $0 | Not Implemented |
OK1009 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $365 | $1,365 | Not Implemented |
OK1009 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,915 | $0 | Implemented |
OK1009 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,224 | $0 | Not Implemented |
OK1009 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,469 | $833 | Implemented |
OK1009 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,453 | $37,361 | Not Implemented |
OK0878 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,064 | $3,192 | Not Implemented |
OK0878 # 14 Y:2014 | 14 | 2014 | INSTALL SET-BACK TIMERS | $6,234 | $1,983 | Not Implemented |
OK0878 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $217 | $1,073 | Not Implemented |
OK0878 # 12 Y:2014 | 12 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,570 | $55,638 | Implemented |
OK0878 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $13,908 | Implemented |
OK0878 # 10 Y:2014 | 10 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,228 | $37,188 | Implemented |
OK0878 # 09 Y:2014 | 09 | 2014 | OPTIMIZE PLANT POWER FACTOR | $6,235 | $11,638 | Not Implemented |
OK0878 # 08 Y:2014 | 08 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,835 | $13,760 | Not Implemented |
OK0878 # 07 Y:2014 | 07 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,821 | $2,573 | Implemented |
OK0878 # 05 Y:2014 | 05 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $229 | $525 | Implemented |
OK0878 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,905 | $262 | Implemented |
OK0878 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,296 | $1,222 | Not Implemented |
OK0878 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,459 | $5,148 | Implemented |
OK0878 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,554 | $1,400 | Implemented |
OK0817 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,438 | $510 | Implemented |
OK0817 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,371 | $0 | Implemented |
OK0817 # 09 Y:2011 | 09 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,450 | $4,260 | Not Implemented |
OK0817 # 08 Y:2011 | 08 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,546 | $12,837 | Not Implemented |