IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
NAICS 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0243 # 02 Y:2025 02 2025 ISOLATE HOT OR COLD EQUIPMENT $65,812 $40,930 n/a
WM0243 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,986 $6,560 n/a
WM0243 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,013 $3,550 n/a
WM0243 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,814 $7,679 n/a
WM0243 # 01 Y:2025 01 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $103,411 $360,000 n/a
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 Not Implemented
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 Not Implemented
IC0306 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,629 $118 Not Implemented
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 Implemented
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 Implemented
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 Implemented
IC0306 # 07 Y:2024 07 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,874 $10,418 Not Implemented
IC0306 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $41,459 $20,803 Not Implemented
TT0277 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,769 $2,815 Not Implemented
TT0277 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,116 $2,790 Not Implemented
TT0277 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $812 $1,090 Not Implemented
TT0277 # 05 Y:2022 05 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,371 $4,045 Not Implemented
TT0277 # 02 Y:2022 02 2022 ADOPT IN-HOUSE MATERIAL GENERATION $11,462 $31,920 Not Implemented
TT0277 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $3,000 Not Implemented
TT0277 # 06 Y:2022 06 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,278 $500 Not Implemented
TT0277 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $15,235 $8,435 Not Implemented
MZ0270 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $235 $400 Not Implemented
MZ0270 # 02 Y:2019 02 2019 USE COMPRESSOR AIR FILTERS $737 $200 Implemented
MZ0270 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,815 $19,000 Not Implemented
MZ0270 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,293 $0 Implemented