Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
570
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0708 # 10 Y:2016 | 10 | 2016 | USE SYNTHETIC LUBRICANT | $566 | $0 | Implemented |
LE0417 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,317 | $46 | Not Implemented |
LE0417 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,844 | $1,000 | Implemented |
LE0417 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $715 | $500 | Implemented |
LE0417 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,687 | $1,868 | Not Implemented |
LE0417 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,602 | $25,000 | Implemented |
LE0417 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,120 | $22,015 | Implemented |
LE0417 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,659 | $62,300 | Implemented |
IP0058 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,007 | $326 | Not Implemented |
IP0058 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $256 | $51 | Not Implemented |
IP0058 # 03 Y:2016 | 03 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $30,281 | $6,819 | Not Implemented |
IP0058 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $11,137 | $4,626 | Not Implemented |
IP0058 # 05 Y:2016 | 05 | 2016 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $227 | $255 | Not Implemented |
IP0058 # 06 Y:2016 | 06 | 2016 | OPTIMIZE PLANT POWER FACTOR | $46,574 | $102,745 | Not Implemented |
NC0548 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,830 | $85,000 | Not Implemented |
NC0548 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,922 | $5,000 | Not Implemented |
NC0548 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,958 | $6,100 | Implemented |
NC0548 # 04 Y:2015 | 04 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,478 | $7,000 | Not Implemented |
NC0548 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $6,019 | $1,500 | Implemented |
NC0548 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,418 | $7,500 | Not Implemented |
NC0548 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $708 | $100 | Implemented |
NC0548 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,444 | $100 | Not Implemented |
NC0548 # 09 Y:2015 | 09 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,904 | $4,258 | Implemented |
NC0548 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,585 | $281 | Implemented |
SF0458 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $6,859 | $840 | Implemented |