IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0415 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,152 $8,843 n/a
MS0415 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $11,642 $2,942 n/a
MS0415 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,575 $72,865 n/a
MS0415 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $115,378 $781,550 n/a
MS0415 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,189 $1,523 n/a
MS0408 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $70,508 $548,100 n/a
MS0408 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $357 $1,634 n/a
MS0408 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,817 $0 n/a
MS0408 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,092 $12,955 n/a
MS0408 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,424 $0 n/a
MS0382 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $17,527 Implemented
MS0382 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,936 $1,056 Not Implemented
MS0382 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,932 $480 Implemented
MS0382 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,805 $0 Implemented
MS0382 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $142 Implemented
MS0382 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,988 $223,560 Not Implemented
MS0381 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,990 $12,600 Implemented
MS0381 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,037 $8,580 Implemented
MS0381 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,709 $57,080 Not Implemented
MS0381 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $317 Not Implemented
MS0381 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,659 $34,108 Not Implemented
MS0381 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $293 Implemented
MS0373 # 02 Y:2011 02 2011 BURN A LESS EXPENSIVE GRADE OF FUEL $32,874 $100,490 Not Implemented
MS0373 # 01 Y:2011 01 2011 BURN A LESS EXPENSIVE GRADE OF FUEL $26,816 $43,705 Not Implemented
MS0361 # 02 Y:2010 02 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $28,668 $57,500 Not Implemented