Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 333415 | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0305 # 11 Y:2016 | 11 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $35 | $19 | Implemented |
MI0305 # 10 Y:2016 | 10 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $203 | $50 | Implemented |
MI0305 # 09 Y:2016 | 09 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $342 | $760 | Not Implemented |
MI0305 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $380 | $780 | Implemented |
MI0305 # 07 Y:2016 | 07 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,203 | $2,914 | Not Implemented |
MI0305 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,359 | $2,950 | Not Implemented |
MI0305 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,903 | $1,473 | Not Implemented |
MI0305 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,269 | $19,877 | Not Implemented |
MI0305 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,922 | $1,700 | Implemented |
MI0305 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,453 | $13,550 | Not Implemented |
MI0305 # 01 Y:2016 | 01 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $21,479 | $10,875 | Not Implemented |
UM0472 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,915 | $12,000 | n/a |
UM0472 # 03 Y:2016 | 03 | 2016 | ADD AREA LIGHTING SWITCHES | $22,157 | $2,680 | n/a |
UM0472 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,743 | $18,830 | n/a |
UM0472 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,171 | $1,000 | n/a |
AM0708 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $36,410 | $52,120 | Implemented |
AM0708 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,880 | $115,670 | Implemented |
AM0708 # 03 Y:2016 | 03 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,000 | $3,900 | Implemented |
AM0708 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,830 | $5,000 | Implemented |
AM0708 # 05 Y:2016 | 05 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,980 | $2,000 | Implemented |
AM0708 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,800 | $23 | Implemented |
AM0708 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,290 | $0 | Implemented |
AM0708 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,280 | $690 | Implemented |
AM0708 # 09 Y:2016 | 09 | 2016 | PAY UTILITY BILLS ON TIME | $796 | $0 | Implemented |
AM0708 # 10 Y:2016 | 10 | 2016 | USE SYNTHETIC LUBRICANT | $566 | $0 | Implemented |