Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsNAICS | 333514 | Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0948 # 02 Y:2020 | 02 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,998 | $2,000 | Implemented |
GT0948 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,480 | $2,300 | Implemented |
GT0948 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,987 | $503,684 | Not Implemented |
GT0948 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $722 | $1,492 | Implemented |
GT0948 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,214 | $12,496 | Implemented |
GT0948 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $8,479 | $4,145 | Implemented |
GT0948 # 03 Y:2020 | 03 | 2020 | AIR CONDITION ONLY SPACE NECESSARY | $6,270 | $2,979 | Implemented |
TT0188 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,331 | $8,433 | Not Implemented |
TT0188 # 02 Y:2017 | 02 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $10,583 | $100 | Implemented |
TT0188 # 05 Y:2017 | 05 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $684 | $450 | Not Implemented |
TT0188 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,153 | $890 | Implemented |
TT0188 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $23,768 | $97,975 | Not Implemented |
SD0485 # 01 Y:2014 | 01 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $117,088 | $25,225 | Not Implemented |
SD0485 # 03 Y:2014 | 03 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $25,053 | $91,900 | Implemented |
SD0485 # 04 Y:2014 | 04 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,807 | $28,125 | Implemented |
SD0485 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,114 | $1,000 | Implemented |
SD0485 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,720 | $5,000 | Implemented |
SD0485 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $1,975 | $5,550 | Implemented |
SD0485 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,832 | $4,400 | Implemented |
WM0011 # 03 Y:2012 | 03 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $293 | $265 | Implemented |
WM0011 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,063 | $440 | Implemented |
WM0011 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,000 | $0 | Implemented |
WM0011 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $406 | $600 | Not Implemented |
WM0011 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $357 | $0 | Not Implemented |
WM0011 # 09 Y:2012 | 09 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $2,993 | $3,000 | Implemented |