IAC logo
IAC Assessment: TT0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2017
Principal Product Plastic Injection Molds
NAICS 333514 - Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 41,100
Annual Production 180 Pieces
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,115 1,639,500 kWh $0.07
Electricity Demand $43,597 3,407 kW-months/year $12.80
Natural Gas $11,129 1,597 MMBtu $6.97
TOTAL ENERGY COSTS $167,996
RECOMMENDED SAVINGS* $40,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,736
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$23,768
Cost:
$97,975
$23,768 319,700 - - - - $23,768
319,700
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$10,583
Cost:
$100
- - $10,583 827 - - -
-
kWh
$10,583
827
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,331
Cost:
$8,433
$3,280 47,545 $51 4 - - $3,280
47,545
kWh
$51
4
kW-months/year
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,153
Cost:
$890
$2,153 31,200 - - - - $2,153
31,200
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$684
Cost:
$450
$346 5,010 - - $338 48 $346
5,010
kWh
-
-
kW-months/year
$338
48
MMBtu
TOTAL RECOMMENDED Savings:
$40,519
Cost:
$107,848
$29,547 403,455 $10,634 831 $338 48 $29,547
403,455
kWh
$10,634
831
kW-months/year
$338
48
MMBtu
TOTAL IMPLEMENTED Savings:
$12,736
Cost:
$990
$2,153 31,200 $10,583 827 - - $2,153
31,200
kWh
$10,583
827
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas