IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
NAICS 333514 Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0128 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,981 $1,440 Not Implemented
TA0128 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $1,030 Not Implemented
TA0128 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,032 $10,650 Not Implemented
TA0128 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,927 $0 Not Implemented
UD0738 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $91,800 $6,000 Implemented
UD0738 # 02 Y:2006 02 2006 RECOVER AND REUSE WASTE MATERIAL $28,944 $2,000 Not Implemented
UD0738 # 03 Y:2006 03 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,313 $0 Implemented
UD0738 # 04 Y:2006 04 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,084 $0 Implemented
UD0738 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,819 $0 Not Implemented
UD0738 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,479 $1,700 Not Implemented
UD0738 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,348 $500 Implemented
UD0738 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $859 $0 Implemented
UD0738 # 09 Y:2006 09 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $658 $500 Implemented
UD0738 # 10 Y:2006 10 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $0 Not Implemented
UD0738 # 11 Y:2006 11 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $382 $459 Implemented
UD0738 # 12 Y:2006 12 2006 RECOVER WASTE HEAT FROM EQUIPMENT $89 $400 Not Implemented