IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 333515 Cutting Tool and Machine Tool Accessory Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0057 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $381 $1,824 Implemented
MU0057 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $0 Implemented
MU0057 # 09 Y:2024 09 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $223 $0 Implemented
MU0057 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,761 $0 Implemented
MU0057 # 14 Y:2024 14 2024 PAY BILLS ON TIME TO AVOID LATE FEES $269 $0 Implemented
MU0057 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,118 $0 Implemented
MU0057 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $596 $0 Implemented
MU0057 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,897 $4,100 Implemented
MU0057 # 10 Y:2024 10 2024 INSTALL TIMERS AND/OR THERMOSTATS $528 $1,180 Implemented
SD0630 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $1,500 Implemented
SD0630 # 08 Y:2023 08 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,832 $1,080 Implemented
SD0630 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,113 $3,606 Implemented
SD0630 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,881 $57,222 Implemented
SD0630 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $13,269 Implemented
SD0630 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,850 $9,294 Implemented
SD0630 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $500 Implemented
SD0630 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,064 $7,542 Implemented
MI0349 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,314 $3,100 Implemented
MI0349 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,623 $13,592 Implemented
MI0349 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,565 $9,500 Implemented
MI0349 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,966 $2,644 Implemented
MI0349 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $3,414 $972 Implemented
MI0349 # 09 Y:2019 09 2019 USE PHOTOCELL CONTROLS $1,282 $622 Implemented
MA0782 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $600 Implemented
MA0782 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $277 $100 Implemented