IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0219 # 09 Y:2019 09 2019 APPLY FOR INVESTMENT INCENTIVES $1,440 $0 Implemented
TT0219 # 08 Y:2019 08 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,757 $16,291 Implemented
TT0219 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,725 $12,000 Not Implemented
TT0219 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,337 $31,000 Not Implemented
TT0219 # 03 Y:2019 03 2019 USE OPTIMUM THICKNESS INSULATION $27,754 $105,000 Implemented
TT0219 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $50,161 $360 Implemented
TT0219 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,170 $61,967 Implemented
TT0219 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,306 $18,000 Not Implemented
TT0197 # 03 Y:2017 03 2017 APPLY FOR INVESTMENT INCENTIVES $31,640 $150 Implemented
TT0197 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,267 $3,050 Not Implemented
TT0197 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $6,006 $10,000 Not Implemented
TT0197 # 01 Y:2017 01 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $19,976 $72,881 Not Implemented
TT0197 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,919 $17,290 Not Implemented
TT0075 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,202 $14,000 Implemented
TT0075 # 01 Y:2011 01 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,083 $42,000 Not Implemented
TT0075 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $109,802 $50,000 Not Implemented
TT0075 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $47,625 $21,000 Implemented
TT0075 # 05 Y:2011 05 2011 INSTALL COMMON HEADER ON COMPRESSORS $44,869 $32,200 Implemented
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
TT0073 # 01 Y:2011 01 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,566 $9,650 Implemented
TT0059 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $5 Implemented
TT0059 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $4,900 Not Implemented