IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2315 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $323 $855 n/a
UC2315 # 13 Y:2023 13 2023 ADOPT IN-HOUSE MATERIAL GENERATION $10,809 $60,198 n/a
UC2315 # 12 Y:2023 12 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $9,576 $41,370 n/a
UC2315 # 09 Y:2023 09 2023 USE HEAT PUMP FOR SPACE CONDITIONING $5,665 $31,002 n/a
UC2315 # 02 Y:2023 02 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $354 $222 n/a
UC2315 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,189 $268,543 n/a
UC2315 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,770 $559 n/a
UC2315 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $269 $0 n/a
UC2315 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,231 $150 n/a
UC2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,868 $11,165 n/a
UC2315 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $75 n/a
UC2315 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,601 $25,290 n/a
UC2315 # 10 Y:2023 10 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,746 $34,025 n/a
WM0205 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $540 $148 Not Implemented
WM0205 # 05 Y:2023 05 2023 USE COMPRESSOR AIR FILTERS $595 $2,789 Not Implemented
WM0205 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,577 $0 Not Implemented
WM0205 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $3,044 Not Implemented
WM0205 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $1,827 Not Implemented
WM0205 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $3,501 $13,280 Not Implemented
WM0205 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $367 $240 Not Implemented
UD1061 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,024 $375 Implemented
UD1061 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,507 $1,764 Not Implemented
UD1061 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $952 Implemented
UD1061 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,383 $8,996 Not Implemented
UD1061 # 03 Y:2023 03 2023 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,796 $340 Not Implemented