IAC logo
IAC Assessment: UC2315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Industrial heating equipment
NAICS 333994 - Industrial Process Furnace and Oven Manufacturing
SIC 3567 - Industrial Furnaces And Ovens
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 47,000
Annual Production 90,000 Pieces
Production Hrs. Annual 2,340
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,428 396,383 kWh $0.10
Electricity Demand $35,396 1,578 kW-months/year $22.43
Electricity Fees $3,764 - $ -
Natural Gas $7,408 395 MMBtu $18.76
TOTAL ENERGY COSTS $86,997
RECOMMENDED SAVINGS* $75,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$269
Cost:
-
- - - - $269 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$269
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$354
Cost:
$222
$272 2,665 $82 4 - - - - - - - - - - $272
2,665
kWh
$82
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,868
Cost:
$11,165
$3,781 37,066 $4,263 190 - - - - - - $(-267) - $91 - $3,781
37,066
kWh
$4,263
190
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-267)
-
$
$91
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$323
Cost:
$855
$248 2,434 $75 3 - - - - - - - - - - $248
2,434
kWh
$75
3
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$534
Cost:
$75
$410 4,023 $124 6 - - - - - - - - - - $410
4,023
kWh
$124
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,231
Cost:
$150
$1,715 16,811 $517 23 - - - - - - - - - - $1,715
16,811
kWh
$517
23
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,770
Cost:
$559
$112 1,100 $34 2 - - $1,624 87 - - - - - - $112
1,100
kWh
$34
2
kW-months/year
-
-
$
$1,624
87
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,601
Cost:
$25,290
$(-651) (-6,381) $(-511) (-23) - - $4,763 254 - - - - - - $(-651)
(-6,381)
kWh
$(-511)
(-23)
kW-months/year
-
-
$
$4,763
254
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$5,665
Cost:
$31,002
$(-998) (-9,789) $(-615) (-27) - - $7,279 388 - - - - - - $(-998)
(-9,789)
kWh
$(-615)
(-27)
kW-months/year
-
-
$
$7,279
388
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$3,746
Cost:
$34,025
$367 3,600 $111 5 $4,200 - $(-932) (-49) - - - - - - $367
3,600
kWh
$111
5
kW-months/year
$4,200
-
$
$(-932)
(-49)
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,189
Cost:
$268,543
$29,189 286,167 - - - - - - - - - - - - $29,189
286,167
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
12: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$9,576
Cost:
$41,370
$(-868) (-8,505) $10,766 480 $(-323) - - - - - - - - - $(-868)
(-8,505)
kWh
$10,766
480
kW-months/year
$(-323)
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
13: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$10,809
Cost:
$60,198
$(-2,921) (-28,634) $(-879) (-39) - - - - $14,608 - - - - - $(-2,921)
(-28,634)
kWh
$(-879)
(-39)
kW-months/year
-
-
$
-
-
MMBtu
$14,608
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$75,935
Cost:
$473,454
$30,657 300,557 $13,966 623 $4,147 - $12,734 680 $14,608 - $(-267) - $91 - $30,657
300,557
kWh
$13,966
623
kW-months/year
$4,147
-
$
$12,734
680
MMBtu
$14,608
-
$
$(-267)
-
$
$91
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost