IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

404

matching recommendations
Reset
NAICS 33391 Pump and Compressor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0852 # 06 Y:2008 06 2008 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $22,600 $60,000 Not Implemented
GT0852 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,667 $37,500 Implemented
GT0852 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,037 $64,132 Not Implemented
MA0629 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,363 $2,800 Implemented
MA0629 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $2,100 Not Implemented
MA0629 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,726 $6,800 Not Implemented
MA0629 # 04 Y:2008 04 2008 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,367 $3,000 Not Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented
MA0629 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $400 Implemented
MA0629 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $247 $200 Implemented
NC0369 # 01 Y:2007 01 2007 COVER OPEN TANKS $11,745 $2,500 Not Implemented
NC0369 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,750 $13,500 Implemented
NC0369 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,420 $1,500 Implemented
NC0369 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,910 $100 Implemented
NC0369 # 05 Y:2007 05 2007 KEEP BOILER TUBES CLEAN $2,955 $1,000 Implemented
NC0369 # 06 Y:2007 06 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,730 $0 Implemented
NC0369 # 07 Y:2007 07 2007 DEVELOP A REPAIR/REPLACE POLICY $968 $2,159 Not Implemented
NC0369 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,862 $0 Not Implemented
NC0369 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $1,564 Not Implemented
AM0512 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $48,200 $0 Implemented
AM0512 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,440 $0 Implemented
AM0512 # 03 Y:2006 03 2006 RECOVER AND REUSE WASTE MATERIAL $6,200 $9,135 Not Implemented
AM0512 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $0 Not Implemented
AM0512 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,965 $860 Implemented
AM0512 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented