Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 33391 | Pump and Compressor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0484 # 07 Y:2019 | 07 | 2019 | BURN A LESS EXPENSIVE GRADE OF FUEL | $87,917 | $290,000 | Implemented |
LE0484 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,879 | $51,500 | Implemented |
LE0484 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,805 | $5,500 | Implemented |
LE0484 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,910 | $23,990 | Implemented |
LE0484 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,670 | $2,500 | Implemented |
LE0484 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,873 | $6,000 | Implemented |
LE0484 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $7,603 | $0 | Implemented |
LE0281 # 10 Y:2008 | 10 | 2008 | USE SYNTHETIC LUBRICANT | $508 | $500 | Not Implemented |
LE0281 # 12 Y:2008 | 12 | 2008 | INSTALL OCCUPANCY SENSORS | $3,557 | $780 | Not Implemented |
LE0281 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,106 | $34,067 | Not Implemented |
LE0281 # 01 Y:2008 | 01 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $9,502 | $3,600 | Not Implemented |
LE0281 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $670 | $120 | Not Implemented |
LE0281 # 08 Y:2008 | 08 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $696 | $800 | Not Implemented |
LE0281 # 07 Y:2008 | 07 | 2008 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $831 | $1,200 | Not Implemented |
LE0281 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $923 | $240 | Implemented |
LE0281 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,306 | $1,000 | Not Implemented |
LE0281 # 04 Y:2008 | 04 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,441 | $2,500 | Implemented |
LE0281 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,659 | $5,000 | Not Implemented |
LE0281 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,477 | $1,790 | Implemented |