IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 33391 Pump and Compressor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0281 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $3,557 $780 Not Implemented
LE0281 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,106 $34,067 Not Implemented
LE0281 # 10 Y:2008 10 2008 USE SYNTHETIC LUBRICANT $508 $500 Not Implemented
LE0281 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $120 Not Implemented
LE0281 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $800 Not Implemented
LE0281 # 07 Y:2008 07 2008 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $831 $1,200 Not Implemented
LE0281 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $240 Implemented
LE0281 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $9,502 $3,600 Not Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented
LE0281 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,659 $5,000 Not Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented
LE0281 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $1,000 Not Implemented
GT0852 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,774 $0 Implemented
GT0852 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,037 $64,132 Not Implemented
GT0852 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,667 $37,500 Implemented
GT0852 # 06 Y:2008 06 2008 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $22,600 $60,000 Not Implemented
GT0852 # 05 Y:2008 05 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,500 $15,600 Not Implemented
GT0852 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $790 $2,775 Not Implemented
GT0852 # 03 Y:2008 03 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,073 $9,000 Not Implemented
GT0852 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,327 $3,500 Implemented
MA0629 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,363 $2,800 Implemented
MA0629 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $2,100 Not Implemented
MA0629 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,726 $6,800 Not Implemented
MA0629 # 04 Y:2008 04 2008 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,367 $3,000 Not Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented