IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

299

matching recommendations
Reset
NAICS 333911 Pump and Pumping Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0957 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $1,020 $813 Not Implemented
GT0957 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $17,635 $350 Implemented
GT0957 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $4,101 $200 Implemented
GT0957 # 08 Y:2021 08 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $78,031 $737,508 Not Implemented
GT0957 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $3,211 $1,067 Implemented
GT0957 # 04 Y:2021 04 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,152 $250 Not Implemented
GT0957 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,036 $38,422 Implemented
GT0957 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,872 $1,050 Implemented
IP0132 # 04 Y:2020 04 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,488 $3,597 Not Implemented
IP0132 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $64 Implemented
IP0132 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $879 $0 Not Implemented
IP0132 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $711 $47 Implemented
GT0940 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,860 $300 Not Implemented
GT0940 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $956 $250 Not Implemented
GT0940 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,480 $3,500 Not Implemented
GT0940 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,602 $1,267 Not Implemented
GT0940 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,838 $36,630 Implemented
GT0940 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $83,791 $569,779 Not Implemented
LE0484 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,879 $51,500 Implemented
LE0484 # 07 Y:2019 07 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $87,917 $290,000 Implemented
LE0484 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,805 $5,500 Implemented
LE0484 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,670 $2,500 Implemented
LE0484 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $5,873 $6,000 Implemented
LE0484 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,910 $23,990 Implemented
LE0484 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $0 Implemented