IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

306

matching recommendations
Reset
NAICS 333911 Pump and Pumping Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0629 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,726 $6,800 Not Implemented
MA0629 # 04 Y:2008 04 2008 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,367 $3,000 Not Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented
MA0629 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $400 Implemented
MA0629 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $247 $200 Implemented
AM0512 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $48,200 $0 Implemented
AM0512 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,440 $0 Implemented
AM0512 # 03 Y:2006 03 2006 RECOVER AND REUSE WASTE MATERIAL $6,200 $9,135 Not Implemented
AM0512 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $0 Not Implemented
AM0512 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,965 $860 Implemented
AM0512 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
AM0512 # 07 Y:2006 07 2006 REUSE RAGS UNTIL COMPLETELY SOILED $1,300 $0 Not Implemented
AM0512 # 08 Y:2006 08 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $800 $0 Not Implemented
AM0512 # 09 Y:2006 09 2006 USE SYNTHETIC LUBRICANT $700 $0 Not Implemented
AM0512 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $0 Not Implemented
IA0372 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $619 Implemented
IA0372 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $381 $510 Implemented
IA0372 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $5,978 Implemented
IA0372 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $519 $462 Implemented
IA0372 # 05 Y:2005 05 2005 AIR CONDITION ONLY SPACE NECESSARY $45,000 $75,000 Implemented
IA0372 # 06 Y:2005 06 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,091 $3,517 Not Implemented
TA0092 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,280 $2,300 Not Implemented
TA0092 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,280 $1,300 Implemented
TA0092 # 03 Y:2005 03 2005 AIR CONDITION ONLY SPACE NECESSARY $3,580 $5 Implemented
TA0092 # 04 Y:2005 04 2005 REDUCE OR ELIMINATE WASTE $2,710 $36 Implemented