Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 333924 | Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1084 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $3,775 | n/a |
UD1084 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,251 | $3,985 | n/a |
UD1084 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $47,804 | $143,413 | n/a |
UD1084 # 03 Y:2024 | 03 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,871 | $6,080 | n/a |
UD1084 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $1,235 | n/a |
UD1084 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $0 | n/a |
UD1082 # 05 Y:2024 | 05 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $20,600 | $93,250 | n/a |
UD1082 # 10 Y:2024 | 10 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $0 | n/a |
UD1082 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,739 | $18,600 | n/a |
UD1082 # 08 Y:2024 | 08 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,575 | $11,626 | n/a |
UD1082 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,431 | $2,001 | n/a |
UD1082 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,369 | $0 | n/a |
UD1082 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,677 | $0 | n/a |
UD1082 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,327 | $9,308 | n/a |
UD1082 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,315 | $760 | n/a |
UD1082 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,232 | $1,235 | n/a |
WV0484 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,489 | $6,113 | Implemented |
WV0484 # 02 Y:2014 | 02 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $24,659 | $51,000 | Not Implemented |
WV0484 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $11,868 | $7,750 | Implemented |
WV0484 # 04 Y:2014 | 04 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,987 | $3,690 | Not Implemented |
WV0484 # 05 Y:2014 | 05 | 2014 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,830 | $5,600 | Not Implemented |
WV0484 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,252 | $4,500 | Implemented |
WV0484 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,693 | $468 | Implemented |
WV0484 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,298 | $0 | Implemented |
WV0484 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,596 | $58,450 | Not Implemented |