Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
672
matching recommendationsNAICS | 33399 | All Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2315 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $9,576 | $41,370 | n/a |
UC2315 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,231 | $150 | n/a |
UC2315 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $75 | n/a |
UC2315 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,770 | $559 | n/a |
UC2315 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,601 | $25,290 | n/a |
UC2315 # 09 Y:2023 | 09 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,665 | $31,002 | n/a |
UC2315 # 10 Y:2023 | 10 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,746 | $34,025 | n/a |
UC2315 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,189 | $268,543 | n/a |
UC2315 # 02 Y:2023 | 02 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $354 | $222 | n/a |
UC2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $11,165 | n/a |
UC2315 # 13 Y:2023 | 13 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,809 | $60,198 | n/a |
UC2315 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $855 | n/a |
UC2315 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $269 | $0 | n/a |
WM0205 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $540 | $148 | n/a |
WM0205 # 07 Y:2023 | 07 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $367 | $240 | n/a |
WM0205 # 05 Y:2023 | 05 | 2023 | USE COMPRESSOR AIR FILTERS | $595 | $2,789 | n/a |
WM0205 # 02 Y:2023 | 02 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $3,501 | $13,280 | n/a |
WM0205 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,577 | $0 | n/a |
WM0205 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,309 | $1,827 | n/a |
WM0205 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $690 | $3,044 | n/a |
UD1061 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,507 | $1,764 | Not Implemented |
UD1061 # 03 Y:2023 | 03 | 2023 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $5,796 | $340 | Not Implemented |
UD1061 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $952 | Implemented |
UD1061 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,383 | $8,996 | Not Implemented |
UD1061 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,024 | $375 | Implemented |