Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
735
matching recommendationsNAICS | 33399 | All Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0326 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,871 | $4,200 | n/a |
TT0326 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,420 | $1,800 | n/a |
TT0326 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $870 | n/a |
TT0326 # 03 Y:2025 | 03 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,701 | $2,400 | n/a |
TT0326 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,234 | $3,600 | n/a |
TT0326 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,637 | $3,000 | n/a |
TT0326 # 06 Y:2025 | 06 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $8,775 | $15,000 | n/a |
TT0326 # 07 Y:2025 | 07 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,975 | $110,000 | n/a |
TT0326 # 10 Y:2025 | 10 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $47,285 | $724,290 | n/a |
TT0326 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT FOR HEAT | $87,059 | $375,030 | n/a |
WM0238 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $0 | n/a |
WM0238 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,981 | $3,250 | n/a |
WM0238 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $624 | $0 | n/a |
WM0238 # 03 Y:2025 | 03 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,555 | $2,185 | n/a |
MS0437 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,017 | $458,990 | n/a |
MS0437 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $288,884 | $300,000 | n/a |
MS0437 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $147 | $0 | n/a |
MS0437 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $272 | $2,237 | n/a |
WV0672 # 06 Y:2024 | 06 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,489 | $5,659 | n/a |
WV0672 # 02 Y:2024 | 02 | 2024 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,278 | $31,216 | n/a |
WV0672 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,087 | $759 | n/a |
WV0672 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,058 | $6,936 | n/a |
WV0672 # 03 Y:2024 | 03 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,948 | $26,406 | n/a |
WV0672 # 01 Y:2024 | 01 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,416 | $271,368 | n/a |
WV0672 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,264 | $9,760 | n/a |