Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15
matching recommendationsNAICS | 33399 | All Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0011 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,897 | $0 | Implemented |
IP0011 # 02 Y:2013 | 02 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $12,093 | $0 | Implemented |
IP0011 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,058 | $0 | Implemented |
IP0011 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,428 | $0 | Implemented |
IP0011 # 05 Y:2013 | 05 | 2013 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $980 | $0 | Implemented |
IP0011 # 06 Y:2013 | 06 | 2013 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $131,250 | $15,000 | Not Implemented |
IP0011 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,449 | $1,081 | Not Implemented |
IP0011 # 08 Y:2013 | 08 | 2013 | OPTIMIZE PLANT POWER FACTOR | $14,000 | $9,864 | Not Implemented |
IP0011 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,010 | $27,442 | Implemented |
IP0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,520 | $0 | Implemented |
IP0004 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,343 | $0 | Implemented |
IP0004 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,110 | $0 | Implemented |
IP0004 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,686 | $18,150 | Implemented |
IP0004 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,462 | $15,867 | Not Implemented |
IP0004 # 06 Y:2012 | 06 | 2012 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $10,500 | $27,000 | Not Implemented |