IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 33399 All Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0126 # 07 Y:2022 07 2022 USE SOLAR HEAT FOR HEAT $2,171 $13,500 n/a
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a
CW0126 # 05 Y:2022 05 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0126 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,675 $20,960 n/a
CW0126 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,461 $15,547 n/a
CW0126 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $0 n/a
CW0126 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,047 $54,963 n/a
UF0588 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,352 $0 Implemented
UF0588 # 05 Y:2022 05 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,162 $12,350 Implemented
UF0588 # 07 Y:2022 07 2022 IMPROVE SPACE COMFORT CONDITIONING $9,728 $4,480 Implemented
UF0588 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,751 $17,178 Implemented
UF0588 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,121 $756 Implemented
UF0588 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $84,856 $35,131 Not Implemented
UF0588 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $91,215 $297,040 Implemented
UW2212 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $160 Not Implemented
UW2212 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $405 $0 Implemented
UW2212 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,231 $0 Implemented
TT0275 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $32,630 $34,500 Not Implemented
TT0275 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,633 $2,905 Implemented
TT0275 # 03 Y:2022 03 2022 IMPROVE SPACE COMFORT CONDITIONING $11,751 $28,120 Not Implemented
TT0275 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $8,032 $30,830 Not Implemented
TT0275 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,126 $50 Not Implemented
TT0275 # 06 Y:2022 06 2022 AIR CONDITION ONLY SPACE NECESSARY $3,488 $9,000 Implemented
TT0275 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,643 $2,500 Not Implemented
TT0275 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,083 $500 Not Implemented