Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
48
matching recommendationsNAICS | 333994 | Industrial Process Furnace and Oven Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0326 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,637 | $3,000 | n/a |
TT0326 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,234 | $3,600 | n/a |
TT0326 # 03 Y:2025 | 03 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,701 | $2,400 | n/a |
TT0326 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,420 | $1,800 | n/a |
TT0326 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $870 | n/a |
TT0326 # 06 Y:2025 | 06 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $8,775 | $15,000 | n/a |
TT0326 # 07 Y:2025 | 07 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,975 | $110,000 | n/a |
TT0326 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,871 | $4,200 | n/a |
TT0326 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT FOR HEAT | $87,059 | $375,030 | n/a |
TT0326 # 10 Y:2025 | 10 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $47,285 | $724,290 | n/a |
UC2315 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,770 | $559 | n/a |
UC2315 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $269 | $0 | n/a |
UC2315 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,601 | $25,290 | n/a |
UC2315 # 09 Y:2023 | 09 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,665 | $31,002 | n/a |
UC2315 # 10 Y:2023 | 10 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $3,746 | $34,025 | n/a |
UC2315 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,189 | $268,543 | n/a |
UC2315 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $9,576 | $41,370 | n/a |
UC2315 # 13 Y:2023 | 13 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,809 | $60,198 | n/a |
UC2315 # 02 Y:2023 | 02 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $354 | $222 | n/a |
UC2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $11,165 | n/a |
UC2315 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $855 | n/a |
UC2315 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $75 | n/a |
UC2315 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,231 | $150 | n/a |
TT0295 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $646 | $2,610 | Not Implemented |
TT0295 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $377 | $150 | Not Implemented |