Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsNAICS | 333996 | Fluid Power Pump and Motor Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0041 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $6,020 | n/a |
CC0041 # 02 Y:2024 | 02 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $8,109 | $0 | n/a |
CC0041 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $4,448 | $6,882 | n/a |
CC0041 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,256 | $0 | n/a |
CC0041 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $180 | $308 | n/a |
CC0041 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,484 | $0 | n/a |
CC0041 # 07 Y:2024 | 07 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $563 | $0 | n/a |
CC0041 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,392 | $0 | n/a |
UD1086 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,780 | $0 | Not Implemented |
UD1086 # 02 Y:2024 | 02 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $573 | $0 | Implemented |
UD1086 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,459 | $7,620 | Not Implemented |
UD1086 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $54 | $0 | Not Implemented |
UD1086 # 01 Y:2024 | 01 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,814 | $0 | Not Implemented |
UD1086 # 04 Y:2024 | 04 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,233 | $0 | Not Implemented |
UD1086 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $561 | $0 | Implemented |
UD1086 # 05 Y:2024 | 05 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,962 | $7,238 | Not Implemented |
UD1086 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,965 | $1,068 | Not Implemented |
UD1086 # 10 Y:2024 | 10 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,429 | $25,300 | Not Implemented |
UD1086 # 11 Y:2024 | 11 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,817 | $0 | Not Implemented |
LT8385 # 01 Y:2023 | 01 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,415 | $0 | n/a |
LT8385 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,834 | $7,403 | n/a |
LT8385 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $705 | n/a |
CC0023 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,864 | $750,960 | n/a |
CC0023 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,633 | $40,000 | n/a |
CC0023 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $55,102 | $47,144 | n/a |