IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0793 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,323 $28,940 Not Implemented
MA0793 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,012 $500 Implemented
MA0793 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,522 $1,000 Not Implemented
MA0793 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,289 $5,525 Not Implemented
MA0793 # 06 Y:2018 06 2018 REDUCE VENTILATION AIR $419 $1,000 Not Implemented
MA0793 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $5,974 Implemented
MA0783 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,760 Implemented
MA0783 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,697 $19,975 Not Implemented
MA0783 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,297 $14,420 Implemented
MA0783 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $17,909 $431,094 Not Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MA0756 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $6,277 $2,320 Not Implemented
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0756 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $576 $1,392 Not Implemented
MA0756 # 05 Y:2016 05 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,508 $10,800 Not Implemented
MA0756 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $1,278 $1,000 Not Implemented
MA0680 # 01 Y:2011 01 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,371 $45,123 Implemented
MA0680 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $3,229 $2,895 Implemented
MA0680 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $630 $2,895 Implemented
MA0680 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $2,000 Not Implemented
MA0680 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $151 $0 Implemented
MA0667 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,129 $6,340 Not Implemented
MA0667 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,515 $4,000 Not Implemented
MA0667 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $729 $180 Implemented
MA0667 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $525 $550 Not Implemented