Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
962
matching recommendationsNAICS | 334 | Computer and Electronic Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0044 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,340 | $18,058 | n/a |
NT0044 # 03 Y:2025 | 03 | 2025 | INSTALL EQUIPMENT TO MOVE PRODUCT | $150,000 | $182,000 | n/a |
NT0044 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $31,678 | $5,000 | n/a |
NT0044 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,097 | $5,753 | n/a |
NT0044 # 02 Y:2025 | 02 | 2025 | INSTALL SET-BACK TIMERS | $1,025 | $785 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,383 | $470,000 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
AS0605 # 03 Y:2025 | 03 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,531 | $210 | n/a |
AS0605 # 01 Y:2025 | 01 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,690 | $25,500 | n/a |
AS0605 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,580 | $17,986 | n/a |
AS0605 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $929 | $2,002 | n/a |
AS0605 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $583 | $2,577 | n/a |
AS0605 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $431 | $818 | n/a |
AS0605 # 07 Y:2025 | 07 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $64 | $260 | n/a |
GT0996 # 01 Y:2025 | 01 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $245 | $90 | n/a |
GT0996 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,931 | $15,250 | n/a |
GT0996 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,956 | $3,845 | n/a |
GT0996 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $929 | $3,845 | n/a |
GT0996 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $69,446 | $597,013 | n/a |
GT0996 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $61,043 | $300,000 | n/a |
GT0996 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,898 | $9,000 | n/a |
GT0996 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,373 | $2,600 | n/a |