IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0484 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,860 $954 Not Implemented
SF0484 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,008 $60,348 Implemented
SF0484 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $344 $1,296 Not Implemented
SF0484 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $7,061 $29,179 Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 03 Y:2016 03 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $16,796 $40,060 Not Implemented
MI0298 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,528 $40 Not Implemented
MI0298 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,324 $3,985 Not Implemented
MI0298 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $8,588 Not Implemented
MI0298 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,682 $5,600 Not Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MI0298 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,087 $2,520 Not Implemented
MI0298 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,219 $40 Not Implemented
MI0298 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $664 $760 Not Implemented
MI0298 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $552 $177 Not Implemented
UD0947 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $10,920 $1,000 Implemented
UD0947 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $6,835 $0 Implemented
UD0947 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $953 $2,000 Not Implemented
UD0947 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $618 $200 Not Implemented
UD0947 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $1,000 Not Implemented
UD0947 # 06 Y:2016 06 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $893 $680 Not Implemented
UD0947 # 07 Y:2016 07 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $577 $0 Implemented
UD0947 # 08 Y:2016 08 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,128 $1,593 Not Implemented
UD0947 # 09 Y:2016 09 2016 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,493 $400 Implemented