IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
NAICS 3341 Computer and Peripheral Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0650 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $48,985 $0 n/a
SD0650 # 04 Y:2024 04 2024 USE PHOTOCELL CONTROLS $2,366 $2,165 n/a
SD0650 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $59,676 $88,292 n/a
SD0650 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $786 $1,463 n/a
SD0588 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,578 $7,495 Implemented
SD0588 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 Implemented
SD0588 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $812 $1,395 Implemented
SD0588 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,633 $32,287 Implemented
SF0543 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $12,363 Implemented
SF0543 # 03 Y:2019 03 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $637 $654 Implemented
SF0543 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $757 Implemented
SF0543 # 02 Y:2019 02 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $24,608 $15,012 Implemented
SF0543 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $6,639 $23,288 Implemented
SF0543 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,245 $4,917 Implemented
MI0355 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,503 $2,020 Not Implemented
MI0355 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $95,703 $480 Not Implemented
MI0355 # 09 Y:2019 09 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,604 $2,070 Implemented
MI0355 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,941 $59,135 Implemented
MI0355 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $103,161 $14,000 Implemented
MI0355 # 01 Y:2019 01 2019 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $139,703 $245,760 Not Implemented
MI0355 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,441 $72,870 Implemented
MI0355 # 03 Y:2019 03 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $91,845 $61,708 Not Implemented
MI0355 # 07 Y:2019 07 2019 AIR CONDITION ONLY SPACE NECESSARY $13,642 $960 Not Implemented
SD0557 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,587 $3,500 Not Implemented
SD0557 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,478 $600 Implemented