Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsNAICS | 33411 | Computer and Peripheral Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0543 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,639 | $23,288 | Implemented |
MI0355 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,441 | $72,870 | Implemented |
MI0355 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,941 | $59,135 | Implemented |
MI0355 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $13,642 | $960 | Not Implemented |
MI0355 # 03 Y:2019 | 03 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $91,845 | $61,708 | Not Implemented |
MI0355 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $103,161 | $14,000 | Implemented |
MI0355 # 01 Y:2019 | 01 | 2019 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $139,703 | $245,760 | Not Implemented |
MI0355 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,503 | $2,020 | Not Implemented |
MI0355 # 09 Y:2019 | 09 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,604 | $2,070 | Implemented |
MI0355 # 04 Y:2019 | 04 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $95,703 | $480 | Not Implemented |
SD0557 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $43,867 | $5,775 | Not Implemented |
SD0557 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,848 | $25,956 | Not Implemented |
SD0557 # 03 Y:2017 | 03 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,188 | $9,450 | Not Implemented |
SD0557 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,587 | $3,500 | Not Implemented |
SD0557 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $1,570 | $1,860 | Implemented |
SD0557 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,225 | $3,775 | Implemented |
SD0557 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,478 | $600 | Implemented |
SD0557 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,245 | $900 | Implemented |
BS0069 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $99 | $576 | Implemented |
BS0069 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $879 | $503 | Implemented |
BS0069 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $975 | $1,145 | Implemented |
BS0069 # 05 Y:2015 | 05 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $198 | $374 | Implemented |
BS0069 # 06 Y:2015 | 06 | 2015 | PAY UTILITY BILLS ON TIME | $33 | $0 | Not Implemented |
BS0069 # 02 Y:2015 | 02 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $159 | $916 | Not Implemented |
SU0393 # 08 Y:2015 | 08 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $207 | $488 | Implemented |