IAC Assessment: SD0557
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Hard disk drive components
NAICS 334112 - Computer Storage Device Manufacturing
SIC 3572 - Computer Storage Devices
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 27,000
Annual Production 70,000,000 Units
Production Hrs. Annual 3,900
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $190,051 1,110,806 kWh $0.17
Natural Gas $3,802 3,213 MMBtu $1.18
TOTAL ENERGY COSTS $193,853
RECOMMENDED SAVINGS* $64,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,518
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$43,867
Cost:
$5,775
$53,735 314,053 $(-9,868) (-1,410) - - $53,735
314,053
kWh
$(-9,868)
(-1,410)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,848
Cost:
$25,956
$7,631 44,595 - - $217 - $7,631
44,595
kWh
-
-
MMBtu
$217
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,188
Cost:
$9,450
$3,188 18,634 - - - - $3,188
18,634
kWh
-
-
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,587
Cost:
$3,500
$2,587 15,120 - - - - $2,587
15,120
kWh
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,478
Cost:
$600
$2,478 14,483 - - - - $2,478
14,483
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,570
Cost:
$1,860
$1,570 9,179 - - - - $1,570
9,179
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,245
Cost:
$900
$1,245 7,274 - - - - $1,245
7,274
kWh
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,225
Cost:
$3,775
$1,225 7,160 - - - - $1,225
7,160
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,008
Cost:
$51,816
$73,659 430,498 $(-9,868) (-1,410) $217 - $73,659
430,498
kWh
$(-9,868)
(-1,410)
MMBtu
$217
-
$
TOTAL IMPLEMENTED Savings:
$6,518
Cost:
$7,135
$6,518 38,096 - - - - $6,518
38,096
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost