IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 334111 Electronic Computer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0650 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $59,676 $88,292 Not Implemented
SD0650 # 04 Y:2024 04 2024 USE PHOTOCELL CONTROLS $2,366 $2,165 Implemented
SD0650 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $786 $1,463 Implemented
SD0650 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $48,985 $0 Not Implemented
SD0588 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,578 $7,495 Implemented
SD0588 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,633 $32,287 Implemented
SD0588 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $812 $1,395 Implemented
SD0588 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $407 $0 Implemented
SF0543 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $757 Implemented
SF0543 # 02 Y:2019 02 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $24,608 $15,012 Implemented
SF0543 # 03 Y:2019 03 2019 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $637 $654 Implemented
SF0543 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,245 $4,917 Implemented
SF0543 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $12,363 Implemented
SF0543 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $6,639 $23,288 Implemented
DL0104 # 18 Y:2013 18 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,900 $45,000 Not Implemented
DL0104 # 01 Y:2013 01 2013 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $31,000 $510 Not Implemented
DL0104 # 19 Y:2013 19 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $19,700 $100 Not Implemented
DL0104 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $5,100 $280 Not Implemented
DL0104 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,500 $780 Not Implemented
DL0104 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $39,500 $1,000 Not Implemented
DL0104 # 04 Y:2013 04 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,300 $100 Not Implemented
DL0104 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,600 $100 Not Implemented
DL0104 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,500 $100 Not Implemented
DL0104 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,800 $100 Not Implemented
DL0104 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,300 $9,570 Not Implemented