Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 334111 | Electronic Computer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0650 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,676 | $88,292 | Not Implemented |
SD0650 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $2,366 | $2,165 | Implemented |
SD0650 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $786 | $1,463 | Implemented |
SD0650 # 02 Y:2024 | 02 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $48,985 | $0 | Not Implemented |
SD0588 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,578 | $7,495 | Implemented |
SD0588 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,633 | $32,287 | Implemented |
SD0588 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $812 | $1,395 | Implemented |
SD0588 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $407 | $0 | Implemented |
SF0543 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,772 | $757 | Implemented |
SF0543 # 02 Y:2019 | 02 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $24,608 | $15,012 | Implemented |
SF0543 # 03 Y:2019 | 03 | 2019 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $637 | $654 | Implemented |
SF0543 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,245 | $4,917 | Implemented |
SF0543 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,652 | $12,363 | Implemented |
SF0543 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,639 | $23,288 | Implemented |
DL0104 # 18 Y:2013 | 18 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,900 | $45,000 | Not Implemented |
DL0104 # 01 Y:2013 | 01 | 2013 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $31,000 | $510 | Not Implemented |
DL0104 # 19 Y:2013 | 19 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $19,700 | $100 | Not Implemented |
DL0104 # 10 Y:2013 | 10 | 2013 | MINIMIZE WATER USAGE | $5,100 | $280 | Not Implemented |
DL0104 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,500 | $780 | Not Implemented |
DL0104 # 03 Y:2013 | 03 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $39,500 | $1,000 | Not Implemented |
DL0104 # 04 Y:2013 | 04 | 2013 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,300 | $100 | Not Implemented |
DL0104 # 05 Y:2013 | 05 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,600 | $100 | Not Implemented |
DL0104 # 06 Y:2013 | 06 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,500 | $100 | Not Implemented |
DL0104 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,800 | $100 | Not Implemented |
DL0104 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,300 | $9,570 | Not Implemented |