Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0186 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,614 $2,164 n/a
IP0186 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $4,430 n/a
IP0186 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $97 $93 n/a
IP0186 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,193 $750 n/a
IP0186 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,473 $71 n/a
IP0186 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $440 $0 n/a
IP0007 # 04 Y:2013 04 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $46,311 $151,951 Not Implemented
IP0007 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $13,528 $33,600 Not Implemented
IP0007 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,744 $0 Implemented
IP0007 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,164 $0 Implemented
UD0681 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $159 $46 Implemented
UD0681 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $105 $160 Not Implemented
UD0681 # 01 Y:2003 01 2003 $82,000 $1,490 Implemented
UD0681 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $230 Not Implemented
UD0681 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $930 $1,360 Implemented
UD0681 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,095 $91 Not Implemented
UD0681 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,095 $1,268 Not Implemented
UD0681 # 08 Y:2003 08 2003 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,740 $0 Implemented
UD0681 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $1,800 $0 Implemented
UD0681 # 06 Y:2003 06 2003 REDUCE VENTILATION AIR $2,785 $1,360 Not Implemented
UD0681 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,840 $700 Not Implemented
UD0681 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $7,947 Implemented
UD0681 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,200 $8,060 Not Implemented
UD0681 # 02 Y:2003 02 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $26,822 $100,000 Not Implemented