IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0942 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,283 $8,000 Not Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 04 Y:2016 04 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $73,902 $31,000 Not Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0942 # 06 Y:2016 06 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $469,328 $2,302,430 Not Implemented
SU0412 # 01 Y:2016 01 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $0 Not Implemented
SU0412 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,342 $480 Not Implemented
SU0412 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $296 $169 Not Implemented
SU0412 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $98 $78 Not Implemented
SU0412 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,474 $3,632 Not Implemented
SU0412 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $1,707 Not Implemented
SU0412 # 07 Y:2016 07 2016 ELIMINATE/REDUCE AN OPERATION $5,577 $9,195 Not Implemented
SU0412 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,742 $6,797 Not Implemented
SU0412 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $119 $576 Not Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 03 Y:2016 03 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $16,796 $40,060 Not Implemented
MI0298 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,528 $40 Not Implemented
MI0298 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,324 $3,985 Not Implemented
MI0298 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $8,588 Not Implemented
MI0298 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,682 $5,600 Not Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MI0298 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,087 $2,520 Not Implemented
MI0298 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,219 $40 Not Implemented
MI0298 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $664 $760 Not Implemented