Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0040 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,421 | $2,496 | Not Implemented |
BS0040 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,977 | $470 | Not Implemented |
BS0040 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $887 | $2,075 | Implemented |
BS0040 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $722 | Implemented |
BS0040 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $316 | $464 | Not Implemented |
BS0040 # 06 Y:2014 | 06 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $232 | $221 | Not Implemented |
BS0040 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $610 | $360 | Not Implemented |
BS0040 # 08 Y:2014 | 08 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $122 | $95 | Not Implemented |
BS0040 # 09 Y:2014 | 09 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $51 | $119 | Not Implemented |
OK0892 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $635 | $689 | Not Implemented |
OK0892 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,055 | $560 | Implemented |
OK0892 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,809 | $7,935 | Not Implemented |
OK0892 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,538 | $1,619 | Not Implemented |
OK0892 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,294 | $3,969 | Not Implemented |
OK0892 # 06 Y:2014 | 06 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,109 | $2,560 | Not Implemented |
OK0892 # 07 Y:2014 | 07 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $105 | $28 | Implemented |
OK0892 # 08 Y:2014 | 08 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $148 | $160 | Implemented |
OK0892 # 09 Y:2014 | 09 | 2014 | REPLACE BOILER | $3,189 | $14,400 | Not Implemented |
OK0892 # 10 Y:2014 | 10 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $167 | $660 | Implemented |
OK0892 # 11 Y:2014 | 11 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,802 | $10,000 | Not Implemented |
OK0892 # 12 Y:2014 | 12 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,648 | $10,200 | Not Implemented |
OK0892 # 13 Y:2014 | 13 | 2014 | INSULATE BARE EQUIPMENT | $2,848 | $899 | Not Implemented |
UD0905 # 01 Y:2014 | 01 | 2014 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $13,929 | $0 | Not Implemented |
UD0905 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM TEMPERATURE | $5,296 | $0 | Implemented |
UD0905 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,682 | $0 | Implemented |