Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2016 |
Principal Product | Electronics |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 141,000 |
Annual Production | 360,000 Pieces |
Production Hrs. Annual | 4,550 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $232,491 | 4,856,714 | kWh | $0.05 |
Electricity Demand | $119,965 | 10,057 | kW-months/year | $11.93 |
Electricity Fees | $45,627 | - | $ | - |
TOTAL ENERGY COSTS | $408,205 | |||
RECOMMENDED SAVINGS* | $138,933 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $66,093 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE |
Savings: $48,743 Cost: $88,928 |
$29,442 | 613,376 | $19,301 | 1,618 | - | - |
$29,442 613,376 kWh |
$19,301 1,618 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $42,734 Cost: $29,594 |
$31,879 | 664,148 | $10,855 | 910 | - | - |
$31,879 664,148 kWh |
$10,855 910 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $8,706 Cost: $5,161 |
$6,499 | 135,391 | $2,207 | 185 | - | - |
$6,499 135,391 kWh |
$2,207 185 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,388 Cost: $1,660 |
$2,850 | 59,374 | $4,538 | 380 | - | - |
$2,850 59,374 kWh |
$4,538 380 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $5,921 Cost: $1,441 |
$4,418 | 92,042 | $1,503 | 126 | - | - |
$4,418 92,042 kWh |
$1,503 126 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $5,648 Cost: $1,360 |
$4,100 | 85,411 | $1,548 | 130 | - | - |
$4,100 85,411 kWh |
$1,548 130 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $4,081 Cost: $4,200 |
$2,506 | 52,212 | $1,575 | 132 | - | - |
$2,506 52,212 kWh |
$1,575 132 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $3,830 Cost: $40 |
$2,864 | 59,671 | $966 | 81 | - | - |
$2,864 59,671 kWh |
$966 81 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,218 Cost: $12,637 |
$1,942 | 40,449 | $1,276 | 107 | - | - |
$1,942 40,449 kWh |
$1,276 107 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,176 Cost: $7,505 |
$3,176 | 66,176 | - | - | - | - |
$3,176 66,176 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,797 Cost: $40 |
$1,105 | 23,030 | $692 | 58 | - | - |
$1,105 23,030 kWh |
$692 58 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,209 Cost: $1,237 |
$1,209 | 25,190 | - | - | - | - |
$1,209 25,190 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $1,012 Cost: $800 |
- | - | - | - | $1,012 | - |
- - kWh |
- - kW-months/year |
$1,012 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $502 Cost: $1,624 |
$216 | 4,499 | $286 | 24 | - | - |
$216 4,499 kWh |
$286 24 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $502 Cost: $760 |
$303 | 6,323 | $199 | 17 | - | - |
$303 6,323 kWh |
$199 17 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $342 Cost: $375 |
$255 | 5,311 | $87 | 7 | - | - |
$255 5,311 kWh |
$87 7 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $124 Cost: $340 |
$75 | 1,572 | $49 | 4 | - | - |
$75 1,572 kWh |
$49 4 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $138,933 Cost: $157,702 |
$92,839 | 1,934,175 | $45,082 | 3,779 | $1,012 | - | $92,839 1,934,175 kWh |
$45,082 3,779 kW-months/year |
$1,012 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $66,093 Cost: $37,350 |
$45,877 | 955,788 | $20,216 | 1,694 | - | - | $45,877 955,788 kWh |
$20,216 1,694 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |