Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
294
matching recommendationsNAICS | 334413 | Semiconductor and Related Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
DL0257 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,383 | $470,000 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
UC2416 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,662 | $1,600 | n/a |
UC2416 # 10 Y:2024 | 10 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $55,311 | $819,496 | n/a |
UC2416 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,494 | $29,062 | n/a |
UC2416 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $240,811 | $2,527,500 | n/a |
UC2416 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $510 | $218 | n/a |
UC2416 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $3,536 | $1,750 | n/a |
UC2416 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,767 | $1,553 | n/a |
UC2416 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $159,604 | $5,236 | n/a |
UC2416 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $80,097 | $301,647 | n/a |
UC2416 # 07 Y:2024 | 07 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $294 | $139 | n/a |
OR0793 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,117 | $0 | n/a |
OR0793 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,695 | $522 | n/a |
OR0793 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $13,689 | $209,197 | n/a |
WM0223 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $994 | Not Implemented |
WM0223 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $971 | $0 | Not Implemented |
WM0223 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,472 | $5,580 | Not Implemented |
WM0223 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,737 | $8,466 | Not Implemented |
WM0223 # 06 Y:2024 | 06 | 2024 | USE PHOTOCELL CONTROLS | $406 | $200 | Not Implemented |
WM0223 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | Not Implemented |
WM0222 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,041 | $0 | Not Implemented |