IAC logo
IAC Assessment: UC2416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Semiconductor wafers
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $5,000,000-$10,000,000
# of Employees 500
Plant Area (Sq.Ft.) 92,600
Annual Production 130,000 Pieces
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,034,443 9,948,743 kWh $0.10
Electricity Demand $356,769 15,359 kW-months/year $23.23
Natural Gas $459,494 53,316 MMBtu $8.62
TOTAL ENERGY COSTS $1,850,705
RECOMMENDED SAVINGS* $635,086 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19,662
Cost:
$1,600
$15,055 144,761 $4,607 198 - - - - $15,055
144,761
kWh
$4,607
198
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$159,604
Cost:
$5,236
$98,630 948,361 $30,179 1,299 $30,796 3,573 - - $98,630
948,361
kWh
$30,179
1,299
kW-months/year
$30,796
3,573
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,767
Cost:
$1,553
$1,239 11,914 $379 16 - - $149 - $1,239
11,914
kWh
$379
16
kW-months/year
-
-
MMBtu
$149
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$510
Cost:
$218
$456 4,380 - - - - $55 - $456
4,380
kWh
-
-
kW-months/year
-
-
MMBtu
$55
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$73,494
Cost:
$29,062
$56,275 541,105 $17,219 741 - - - - $56,275
541,105
kWh
$17,219
741
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,536
Cost:
$1,750
- - - - $3,536 410 - - -
-
kWh
-
-
kW-months/year
$3,536
410
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$294
Cost:
$139
- - - - $294 34 - - -
-
kWh
-
-
kW-months/year
$294
34
MMBtu
-
-
$
08: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$240,811
Cost:
$2,527,500
$184,391 1,772,991 $56,420 2,429 - - - - $184,391
1,772,991
kWh
$56,420
2,429
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$80,097
Cost:
$301,647
$61,331 589,723 $18,766 808 - - - - $61,331
589,723
kWh
$18,766
808
kW-months/year
-
-
MMBtu
-
-
$
10: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$55,311
Cost:
$819,496
$268,843 2,585,030 $6,855 295 $(-220,387) (-25,576) - - $268,843
2,585,030
kWh
$6,855
295
kW-months/year
$(-220,387)
(-25,576)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$635,086
Cost:
$3,688,201
$686,220 6,598,266 $134,424 5,787 $(-185,761) (-21,559) $204 - $686,220
6,598,266
kWh
$134,424
5,787
kW-months/year
$(-185,761)
(-21,559)
MMBtu
$204
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost