IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0609 # 01 Y:2012 01 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $98,005 $5,200 Not Implemented
AM0609 # 02 Y:2012 02 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $37,900 $400 Not Implemented
AM0609 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,215 $2,000 Not Implemented
AM0609 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $24,800 $47,800 Not Implemented
AM0609 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,480 $23,500 Not Implemented
AM0609 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,600 $0 Not Implemented
AM0609 # 07 Y:2012 07 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,950 $500 Not Implemented
AM0609 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $40 Not Implemented
AM0509 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $2,080 $3,690 Implemented
AM0509 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $1,650 $250 Implemented
AM0509 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $913 Implemented
AM0509 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $250 Implemented
AM0509 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $440 $0 Implemented