IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 334417 Electronic Connector Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0476 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $233 Not Implemented
WV0476 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $1,431 Implemented
WV0476 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $301 $90 Implemented
WV0476 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $140 Implemented
WV0476 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $50 Implemented
LE0330 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $67,588 $491,000 Not Implemented
LE0330 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,277 $1,600 Not Implemented
LE0330 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $10,060 $600 Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,482 $1,759 Not Implemented
SF0397 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,301 $9,456 Not Implemented
SF0397 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,066 $2,420 Implemented
SF0397 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $6,639 Not Implemented
SF0397 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,428 $6,271 Implemented
SF0397 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,294 $7,163 Implemented
SF0397 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,656 $79,881 Implemented
SF0397 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,839 $152,713 Not Implemented
MA0666 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,146 $5,990 Not Implemented
MA0666 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,085 $8,685 Not Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0666 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $550 $200 Not Implemented
LL0326 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,220 $15,480 Implemented
LL0326 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,166 $6,970 Implemented
LL0326 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $13,685 $3,250 Implemented