Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2014
Principal Product Cable Assembly
NAICS 334417 - Electronic Connector Manufacturing
SIC 3678 - Electronic Connectors
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 88,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,600
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,070 556,542 kWh $0.18
Natural Gas $13,028 1,153 MMBtu $11.30
TOTAL ENERGY COSTS $111,098
RECOMMENDED SAVINGS* $33,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,240
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,760
Cost:
-
$1,760 10,000 - - - - $1,760
10,000
kWh
-
-
MMBtu
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,240
Cost:
-
$3,240 18,400 - - - - $3,240
18,400
kWh
-
-
MMBtu
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,740
Cost:
$8,382
$2,740 15,540 - - - - $2,740
15,540
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,880
Cost:
$547
$1,880 10,700 - - - - $1,880
10,700
kWh
-
-
MMBtu
-
-
$
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,250
Cost:
-
$1,250 7,100 - - - - $1,250
7,100
kWh
-
-
MMBtu
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,900
Cost:
-
$1,900 10,790 - - - - $1,900
10,790
kWh
-
-
MMBtu
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$990
Cost:
$200
- - $990 87 - - -
-
kWh
$990
87
MMBtu
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$350
Cost:
-
- - $350 31 - - -
-
kWh
$350
31
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$780
Cost:
$200
- - $780 69 - - -
-
kWh
$780
69
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,560
Cost:
$400
- - $1,560 138 - - -
-
kWh
$1,560
138
MMBtu
-
-
$
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,610
Cost:
$2,610
- - $2,610 231 - - -
-
kWh
$2,610
231
MMBtu
-
-
$
12: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,200
Cost:
-
- - - - $14,200 - -
-
kWh
-
-
MMBtu
$14,200
-
$
TOTAL RECOMMENDED Savings:
$33,260
Cost:
$12,339
$12,770 72,530 $6,290 556 $14,200 - $12,770
72,530
kWh
$6,290
556
MMBtu
$14,200
-
$
TOTAL IMPLEMENTED Savings:
$29,240
Cost:
$12,139
$9,530 54,130 $5,510 487 $14,200 - $9,530
54,130
kWh
$5,510
487
MMBtu
$14,200
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes