IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 334417 Electronic Connector Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0326 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,178 $1,470 Not Implemented
LL0326 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,693 $2,340 Not Implemented
UD0801 # 01 Y:2009 01 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $18,742 $14,833 Implemented
UD0801 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $10,610 $14,833 Implemented
UD0801 # 03 Y:2009 03 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,599 $14,833 Implemented
UD0801 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,877 $16,721 Implemented
UD0801 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,100 $14,833 Implemented
UD0801 # 06 Y:2009 06 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,087 $0 Not Implemented
UD0801 # 07 Y:2009 07 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $993 $45,000 Implemented
UD0801 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $62 $0 Not Implemented
WV0376 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,171 $21,771 Implemented
WV0376 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,887 $23,022 Implemented
WV0376 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $7,524 $5,130 Implemented
WV0376 # 04 Y:2008 04 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,524 $8,800 Implemented
WV0376 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,611 $7,140 Implemented
WV0376 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,318 $0 Implemented
WV0376 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,345 $0 Implemented
WV0376 # 08 Y:2008 08 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,621 $425 Implemented
WV0376 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,750 $1,363 Implemented
WV0376 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $387 Implemented
WV0376 # 11 Y:2008 11 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,649 $0 Implemented
WV0376 # 12 Y:2008 12 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $984 $52 Not Implemented
WV0376 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $963 $1,431 Implemented
WV0376 # 14 Y:2008 14 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $196 Implemented
WV0376 # 15 Y:2008 15 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $484 $200 Implemented