IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

319

matching recommendations
Reset
NAICS 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0793 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,323 $28,940 Not Implemented
AS0434 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $68,034 $6,582 Not Implemented
AS0434 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $43,502 $4,394 Not Implemented
AS0434 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,200 Not Implemented
AS0434 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,250 $2,513 Not Implemented
AS0434 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $60 Not Implemented
AS0434 # 06 Y:2017 06 2017 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $461 $450 Not Implemented
AS0434 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $307 $60 Implemented
UF0510 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $1,142 $225 Not Implemented
UF0510 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $1,757 $0 Not Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
AS0439 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $629 $650 Not Implemented
AS0439 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,146 $4,770 Not Implemented
AS0439 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $950 Implemented
AS0439 # 04 Y:2017 04 2017 MAINTAIN MACHINES TO REDUCE LEAKS $734 $545 Not Implemented
MI0294 # 01 Y:2016 01 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $48,743 $88,928 Not Implemented
MI0294 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,734 $29,594 Implemented
MI0294 # 03 Y:2016 03 2016 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,706 $5,161 Not Implemented
MI0294 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,388 $1,660 Implemented
MI0294 # 05 Y:2016 05 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,921 $1,441 Implemented
MI0294 # 06 Y:2016 06 2016 CONDENSE OPERATION INTO ONE BUILDING $5,648 $1,360 Not Implemented
MI0294 # 07 Y:2016 07 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,081 $4,200 Implemented