Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
21
matching recommendationsNAICS | 334419 | Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0368 # 03 Y:2013 | 03 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $15,354 | $800 | Not Implemented |
LE0368 # 13 Y:2013 | 13 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,829 | $2,000 | Not Implemented |
LE0368 # 12 Y:2013 | 12 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,154 | $64,400 | Not Implemented |
LE0368 # 11 Y:2013 | 11 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,665 | $16,200 | Not Implemented |
LE0368 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,761 | $61,150 | Not Implemented |
LE0368 # 09 Y:2013 | 09 | 2013 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $12,354 | $0 | Not Implemented |
LE0368 # 08 Y:2013 | 08 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $688 | $1,200 | Not Implemented |
LE0368 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $618 | $500 | Not Implemented |
LE0368 # 06 Y:2013 | 06 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $4,569 | $4,320 | Not Implemented |
LE0368 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,200 | $1,000 | Not Implemented |
LE0368 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $72 | $72 | Not Implemented |
LE0368 # 02 Y:2013 | 02 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $10,077 | $800 | Not Implemented |
LE0368 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,192 | $1,280 | Not Implemented |
LE0328 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,447 | $60,000 | Not Implemented |
LE0328 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $2,714 | $540 | Not Implemented |
LE0328 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,383 | $2,500 | Implemented |
LE0328 # 06 Y:2011 | 06 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,743 | $3,000 | Not Implemented |
LE0328 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,369 | $15,675 | Implemented |
LE0328 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,650 | $3,000 | Implemented |
LE0328 # 03 Y:2011 | 03 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,853 | $18,000 | Implemented |
LE0328 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,435 | $12,420 | Implemented |