IAC logo
IAC Assessment: LE0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Switches and Connectors
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 56,000
Annual Production 0 Units
Production Hrs. Annual 6,120
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,733 3,132,577 kWh $0.08
Electricity Demand $114,952 8,969 kW-months/year $12.82
Natural Gas $54,729 4,922 MMBtu $11.12
TOTAL ENERGY COSTS $409,414
RECOMMENDED SAVINGS* $73,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,690
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,447
Cost:
$60,000
$16,166 209,946 $5,281 412 - - - - $16,166
209,946
kWh
$5,281
412
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,435
Cost:
$12,420
$9,365 121,617 $3,501 238 - - $569 - $9,365
121,617
kWh
$3,501
238
kW-months/year
-
-
MMBtu
$569
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,853
Cost:
$18,000
$942 12,240 $51 4 $11,860 1,067 - - $942
12,240
kWh
$51
4
kW-months/year
$11,860
1,067
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,650
Cost:
$3,000
$5,009 65,055 $1,641 128 - - - - $5,009
65,055
kWh
$1,641
128
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,369
Cost:
$15,675
$4,169 54,142 $2,038 159 - - $162 - $4,169
54,142
kWh
$2,038
159
kW-months/year
-
-
MMBtu
$162
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,743
Cost:
$3,000
- - $5,743 448 - - - - -
-
kWh
$5,743
448
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,383
Cost:
$2,500
$216 2,800 $4,167 325 - - - - $216
2,800
kWh
$4,167
325
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,714
Cost:
$540
$2,714 32,251 - - - - - - $2,714
32,251
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$73,594
Cost:
$115,135
$38,581 498,051 $22,422 1,714 $11,860 1,067 $731 - $38,581
498,051
kWh
$22,422
1,714
kW-months/year
$11,860
1,067
MMBtu
$731
-
$
TOTAL IMPLEMENTED Savings:
$43,690
Cost:
$51,595
$19,701 255,854 $11,398 854 $11,860 1,067 $731 - $19,701
255,854
kWh
$11,398
854
kW-months/year
$11,860
1,067
MMBtu
$731
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost