IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0576 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,578 $7,342 Implemented
MA0576 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,505 $4,283 Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented
LE0210 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 Implemented
LE0210 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
SD0355 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,397 $0 Implemented
SD0355 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
SD0355 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $897 $700 Implemented
OR0461 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,372,930 $1,150 Implemented
OR0461 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $4,290 $2,690 Implemented
WI0471 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,303 $15,076 Implemented
WI0471 # 02 Y:2004 02 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,108 $59,785 Implemented
WI0471 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,338 $800 Implemented
WI0471 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $640 Implemented
SD0341 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $200 Implemented
SD0341 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $965 $400 Implemented
CO0544 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $152,970 $140,000 Implemented
CO0544 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,600 $300 Implemented
CO0544 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $310 $250 Implemented
LM0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,163 $945 Implemented
LM0071 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,330 $1,200 Implemented