IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

944

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0637 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,130 $5,300 Not Implemented
AM0637 # 03 Y:2013 03 2013 INSTALL SKYLIGHTS $4,110 $6,350 Not Implemented
AM0637 # 04 Y:2013 04 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,790 $4,250 Not Implemented
AM0637 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,500 $260 Not Implemented
AM0637 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $960 $15 Not Implemented
AM0637 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $315 $350 Not Implemented
AM0637 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $260 $0 Not Implemented
AM0637 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $146 $0 Not Implemented
NC0475 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,801 $48,075 Not Implemented
NC0475 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $9,597 $5,600 Not Implemented
NC0475 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,124 Not Implemented
NC0475 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $100 Not Implemented
NC0475 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,988 $4,750 Not Implemented
NC0475 # 06 Y:2013 06 2013 REDUCE FLUID FLOW RATES $16,217 $25,000 Not Implemented
SU0322 # 07 Y:2012 07 2012 UPGRADE OBSOLETE EQUIPMENT $1,164 $5,472 Implemented
SU0322 # 06 Y:2012 06 2012 DISCONNECT BALLASTS $2,772 $9,240 Implemented
SU0322 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $639 Not Implemented
SU0322 # 04 Y:2012 04 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $109 $298 Not Implemented
SU0322 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $876 $528 Implemented
SU0322 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $12,242 $7,179 Not Implemented
SU0322 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,386 $0 Implemented
UD0850 # 01 Y:2012 01 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $2,058 $42,695 Not Implemented
UD0850 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,432 $750 Not Implemented
UD0850 # 03 Y:2012 03 2012 KEEP LAMPS AND REFLECTORS CLEAN $362 $374 Implemented
UD0850 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $15,877 $33,000 Implemented