Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsNAICS | 334513 | Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0644 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,342 | $141,268 | Not Implemented |
UL2312 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,666 | $224,516 | Not Implemented |
UL2312 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $167 | $488 | Not Implemented |
UL2312 # 07 Y:2023 | 07 | 2023 | SHADE WINDOWS FROM SUMMER SUN | $7,159 | $34,500 | Not Implemented |
UL2312 # 01 Y:2023 | 01 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,925 | $0 | Implemented |
UL2312 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $1,620 | Implemented |
UL2312 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,419 | $15,000 | Implemented |
UL2312 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $450 | $0 | Implemented |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |
SU0539 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $10,262 | $5,600 | n/a |
SU0539 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,490 | $11,867 | n/a |
SU0539 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,866 | $1,925 | n/a |
DL0206 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,866 | $0 | Not Implemented |
DL0206 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,447 | $8,852 | Implemented |
DL0206 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,028 | $27,352 | Implemented |
DL0206 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,292 | $0 | Implemented |
DL0206 # 01 Y:2022 | 01 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $917 | $0 | Implemented |
OK1066 # 04 Y:2022 | 04 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $399 | $510 | Not Implemented |
OK1066 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,854 | $7,908 | Not Implemented |
OK1066 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,177 | $23,400 | Implemented |
OK1066 # 06 Y:2022 | 06 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,995 | $191,438 | Not Implemented |
OK1066 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,555 | $0 | Implemented |
OK1066 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,182 | $0 | Not Implemented |
WV0604 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $20,602 | $23,284 | Implemented |
WV0604 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $733 | $35 | Implemented |