IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0252 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $50 Implemented
MZ0237 # 01 Y:2017 01 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,793 $0 Implemented
MZ0237 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $36,123 $11,000 Implemented
MZ0237 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $599 $50 Implemented
MZ0237 # 03 Y:2017 03 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,548 $0 Not Implemented
MZ0237 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $262 $800 Not Implemented
MZ0237 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,338 $0 Implemented
MZ0237 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $0 Implemented
MZ0237 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,362 $25,000 Implemented
MZ0213 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,759 $2,500 Not Implemented
MZ0213 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,940 $1,100 Implemented
MZ0213 # 05 Y:2016 05 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,875 $6,000 Implemented
MZ0213 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $2,000 Not Implemented
MZ0213 # 04 Y:2016 04 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,560 $67,500 Not Implemented
MZ0203 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $11,425 Implemented
MZ0203 # 03 Y:2016 03 2016 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $324 $1,975 Implemented
MZ0203 # 04 Y:2016 04 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,109 $37,500 Not Implemented
MZ0203 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,747 $680 Implemented
MZ0166 # 07 Y:2015 07 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,419 $5,868 Implemented
MZ0166 # 09 Y:2015 09 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,328 $5,600 Implemented
MZ0166 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $119 $180 Implemented
MZ0166 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $675 $900 Implemented
MZ0166 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $6,500 Implemented
MZ0166 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,376 $0 Not Implemented
MZ0166 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,014 $1,160 Implemented