IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0619 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,550 $13,225 Not Implemented
UK1315 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,240 $1,930 Implemented
UK1315 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $943 $2,750 Not Implemented
UK1315 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,528 $0 Implemented
UK1315 # 04 Y:2013 04 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $633 $0 Implemented
UK1315 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $261 $0 Implemented
UK1315 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,766 $2,000 Implemented
UK1315 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $26,356 $52,000 Not Implemented
UK1315 # 08 Y:2013 08 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,395 $1,200 Not Implemented
UK1315 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $4,767 $1,600 Implemented
CO0676 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,670 $2,740 Not Implemented
CO0676 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $250 Implemented
CO0676 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $730 $900 Implemented
CO0676 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,190 $3,000 Implemented
CO0676 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,840 $500 Implemented
IA0503 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,895 $202,405 Not Implemented
IA0503 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,231 $470 Not Implemented
IA0503 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $975 $2,238 Implemented
IA0503 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $105 Not Implemented
IA0503 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $15,108 $8,304 Implemented
IA0503 # 06 Y:2013 06 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,063 $2,204 Implemented
NC0488 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $83,386 $250,000 Not Implemented
NC0488 # 02 Y:2013 02 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,453 $300 Implemented
NC0488 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $100 Implemented
NC0488 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $741 $2,535 Not Implemented